Standard Construction Specifications Part 2 Abu Dhabi Jun 2026
Serving as a mandatory component of contract documents for any highway or parking project in Abu Dhabi. 2. Key Sections and Technical Focus
Part 2 mandates a "Pre-qualification mix design" 30 days prior to casting. No casting is permitted without a valid slump test (tolerance: ±20mm from design) and temperature monitoring (max concrete temp at discharge: 32°C). standard construction specifications part 2 abu dhabi
For the exact clauses, always refer to the latest issue published by the Abu Dhabi Department of Municipalities and Transport (DMT) , as updates occur periodically (e.g., 2018, 2022 editions). This write-up is a general interpretation and not a substitute for the official document. Serving as a mandatory component of contract documents
Based on Abu Dhabi Municipality’s annual reports, 70% of Non-Conformance Reports (NCRs) stem from misinterpretation of Part 2. Here are the top three traps: No casting is permitted without a valid slump